Publications

Magazine articles featuring New Millennium steel joists and deck

Flush-frame composite joists

Constructing data centers against the clock

DATA CENTER DYNAMICS

Shane Clifford from our data center team explains how New Millennium engages early with owners and developers to accelerate speed to market through our comprehensive delivery model and the flexibility of flush-frame composite joists.

Constructing the data center

Construction eBook: Constructing the data center

DATA CENTER DYNAMICS

Created in partnership with New Millennium, this eBook provides crucial insights into accelerating timelines, unlocking supply-chain predictability, rethinking structural performance, and securing built-in sustainability.

Warehouse with exposed steel beams

Designing for 24/7: Architecture for always-on infrastructure

ARCHITECTURAL RECORD

The mission-critical design of a data center must address twin challenges: speed to market and contingency planning. Learn how direct design team cooperation with suppliers ensures engineered and manufactured solutions that control costs, enhance performance, and safeguard project success.

Riveted deck

Creating Connection

CONTINUING EDUCATION CENTER, ARCHITECTURAL RECORD

Innovations in construction materials have improved patient outcomes and nurtured employee retention via healthcare facility design. Advances in structural steel solutions, such as riveted liner deck panels and steel joists with flush-frame connections, have made structural steel a critical part of healthcare construction.

The Sphere in Las Vegas

The power of steel, from strength to shapes

GB&D MAGAZINE

A publication of Green Building and Design, gb&d covers a range of topics. Emphasizing the advantages of steel, this article explores our engineered solutions and spotlights high-profile projects like The Sphere in Las Vegas and Globe Life Field in Texas.

Flush-frame connections

Go for the joists, with flush-frame connections

MODERN STEEL CONSTRUCTION

While open web steel joists are ideal for supporting high-performance floors, this article outlines the important structural and design procedures to consider in advance of application—including flush-frame connections. Our own Joe Pote is co-author. Joe Pote, our Director of R&D, is co-author.