Verizon® Network Switching Station
PROJECT LOCATION: Yonkers, NY
The technology that powers our cell phones is supported behind the scenes at this Verizon® Switching Center. Designed to house mission-critical equipment, this facility relies on the stiffness and vibration performance of steel joists and composite joists with flush-frame connections to meet the demands of this essential infrastructure.
Project Collaborators
- STEEL FABRICATOR:
- Chesapeake Steel, Inc.
- ARCHITECT:
- Genesis AEC
- ENGINEER OF RECORD:
- MPP Engineers, Tectonic Engineering
- GENERAL CONTRACTOR:
- The Walsh Group, Ltd
- STEEL ERECTOR:
- Feinstein Iron Works, Inc.
PRODUCTS
- STEEL JOISTS:
- LH-Series and Flush-Frame Connections
- COMPOSITE JOISTS:
- CJ-Series
- COMPOSITE DECK:
- 2.0 Composite Deck
